TA的每日心情 | 开心 2014-11-2 16:04 |
---|
签到天数: 18 天 [LV.4]偶尔看看III
|
马上注册,下载丰富资料,享用更多功能,让你轻松玩转阳光石油论坛。
您需要 登录 才可以下载或查看,没有账号?欢迎注册
x
【书名】Managed Pressure Drilling
控压钻井
【作者】 Barkim Demirdal
【出版日期】2011
【出版社】 Society of Petroleum Engineers
【文件格式】 PDF
【页数】 167
【内容简介】
SPE/IADC 85310-Development and Testing of a Fully Automated System to
Accurately Control Downhole Pressure During Drilling Operations.
SPE/IADC 91633-Managed Pressure Drilling for Subsea Applications; Well Control Challenges in Deep Waters
SPE/IADC 119442-Control Requirements for High-End Automatic MPD Operations
SPE/IADC 113672-Managed Pressure Drilling Resolves Pressure Depletion Related Problems
in the Development of the HPHT Kristin Field
SPE/IADC 140267-Integrated Downhole Isolation Valve and Managed Pressure Drilling
To Facilitate Development of Sour Fractured-Limestone Gas Reservoir
SPE/IADC 140289-ECD Management and Pore Pressure Determination with MPD
SPE/IADC 114667-Sometimes Neglected Hydraulic Parameters of Underbalanced
and Managed Pressure Drilling Improves Efficiency in GOM
We in East Java, Indonesia
SPE/IADC 119882 Drilling Wells With Narrow Operating Windows Applying the MPD
Constant Bottom Hole Pressure Technology
—How Much the Temperature and Pressure Affects the Operation’s Design
【附件个数】 3
|
|