阳光石油网|石油技术交流|石油人论坛

 找回密码
 欢迎注册
查看: 992|回复: 0

casing running in Floating technology service

[复制链接]

该用户从未签到

发表于 2012-6-5 17:38:07 | 显示全部楼层 |阅读模式

马上注册,下载丰富资料,享用更多功能,让你轻松玩转阳光石油论坛。

您需要 登录 才可以下载或查看,没有账号?欢迎注册

x
Large displacement wells, horizontal well casing, dogleg degree, generally continuous adjustment of the position more, the casing into the generally quite difficult, if not in place in the casing since the casing is very difficult, the generalhave to cementing in place, the loss of large segments of the middle layers. Therefore, in order to ensure the safety of the casing down into the next casing when must be considered to reduce the positive pressure of the lower part of the casing of the borehole wall, reducing the casing into the friction and ensure smooth casing down into the.
      Shengli Oilfield professional floating casing, the lower part of the casing at the air full of state, greatly reducing down into the resistance. The process is characterized by: the process is simple, easy to operate, leading technology. Suitable for 7 ",5-1/2", 9 5/8 "casing of the various types of single well service charge of $ 350,000. Technicians QQ 2466420026.
您需要登录后才可以回帖 登录 | 欢迎注册

本版积分规则

QQ|Archiver|手机版|小黑屋|阳光石油网 ( 鲁ICP备2021003870号-1 )

GMT+8, 2024-5-19 01:06 , Processed in 0.056809 second(s), 19 queries .

Powered by Discuz! X3.4 Licensed

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表