TA的每日心情 | 慵懒 2013-8-6 14:46 |
---|
签到天数: 7 天 [LV.3]偶尔看看II
|
马上注册,下载丰富资料,享用更多功能,让你轻松玩转阳光石油论坛。
您需要 登录 才可以下载或查看,没有账号?欢迎注册
x
Run in hole (RIH)
Pull out of hole (POOH)
Nipple up (N/U)
Rig up (R/U)
Rig down (R/D)
Make up (M/U)
Pick up (P/U)
Back off (B/O)
Slack off (S/O)
Crossover (X/O)
Blockout preventer (BOP)
Subsurface safety valve (SSSV)
Sliding side door (SSD) = Sliding sleeve
Plug back total depth (PBTD)
Total vertical depth (TVD)
Measured depth (MD)
Measurements while drilling (MWD)
Logging while drilling (LWD)
Seismic while drilling (SWD)
Drill collar (DC)
Drill pipe (DP)
High wall drill pipe (HWDP)
Kick off point (KOP)
Rotation kelly bushing (RKB)
Wear bushing (WB)
Casing (CSG)
Tubing (TBG)
High rate water pack (HRWP)
Wire line (W/L)
Electrical submersible pump (ESP)
Shut-in tree pressure (SITP)
Emergency shut down (ESD)
Outside diameter (OD)
Inside diameter (ID)
Expandable sand screen (ESS)
Horse power (HP)
Thru-tubing inflatable permanent cement retainers (TTIPCR)
Make up tool string to end of tubing as follows:
Run tool string in the well at a moderate speed not to exceed 100ft/min.
Circulate at low rate if possible while running in.
Hold this pressure for five minutes.
Monitor pump pressure.
Observe and record SITP.
Drop a setting ball into the tubing and pump down at 4.0bpm.
W/L set a 2.75” blanking plug in Y-tool.
POOH and R/D.
Run comlpetion string (5-1/2”tailpipe + ESS + EIS + 7”liner + EIS + 7”liner + 7”liner hanger) with 5-1/2”float shoe located at 3129.9m MD.
Flush
Mitigate
Sensor
Sidetrack
Resin coated
Implement
Retrieve
Straddle assembly
Bullhead
Disengage
Disconnect
Depressurize =bleed off pressure |
|