1. Improvement of Drilling Technology for the Yarega Heavy Oil Field Development by SAGD Method With Counter Producing and Injecting Wells SPE-171275-RU
2. Practical Control of SAGD Wells With Dual Tubing Strings To Achieve Enhanced Conformance and Production
SPE-149352-MS
3. Control of Reservoir Heterogeneity in SAGD Bitumen Processes SPE-165388-MS
4. Evaluation of New Well Configurations for SAGD in Athabasca McMurray Formation SPE-143487-MS
5. Use of Flow Control Devices (FCDs) to Enforce Conformance in Steam Assisted Gravity Drainage (SAGD) Completions SPE-174416-MS
6. Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells SPE-1014-0036-JPT
7. Steam Circulation Strategies in the Fengcheng SAGD Project to Achieve Enhanced Conformance and Production: A Case Study SPE-174436-MS
8. Characterizing the Effects of Lean Zones and Shale Distribution in Steam-Assisted-Gravity-Drainage Recovery Performance